Cambria Contracting’s personnel are trained, licensed and highly skilled in asbestos and lead abatement. Site specific Variances are sometimes required and written by Cambria’s certified designers with the experience to complete many different ICR56 removal projects safely, such as waste stream separations, controlled demolition, and select pre demolition required abatement projects.
Tents are removed after wrap and cut abatement
procedures are completed. The entire contained section of pipe is then removed and placed inside
an enclosed lined dumpster within the regulated work area.
Bulk removals being conducted beyond full
containment area set up in previously abated section of a plant.
Preparation of tents prior to removal of elevated
pipe insulation on fuel oil lines running to the plant from the tank farm containment location.